Automower® 540 EPOS® image 0
Automower® 540 EPOS® image 1
OfferNew

Commercial Robotic Lawn Mowers

Automower® 540 EPOS®

$8,999.00Rec. retail price incl. GST SKU: 970730307
  • Area capacity8000 m²

Product description

Husqvarna Automower® 540 EPOS® is a robotic lawn mower for efficient commercial turf care. Its capacity makes it suitable for smaller and tighter park areas and roundabouts, as well as for corporate and municipal properties. Built on a new mid-sized platform and backed by 30 years of innovation in robotic mowers, this model guarantees high productivity, first-class cutting results and easy maintenance. The satellite-based Husqvarna EPOS® technology enables wire free installation, reducing downtime and allowing you to customize working areas and set temporary stay-out zones. With a pivoting front axle, the robotic mower easily handles uneven surfaces and slopes with inclinations of up to 50% (27˚).

5-year warrantyFinance options

Product Information

Features (18)

Virtual, wire-free operation through satellite based RTK-GNSS technology, enables an accuracy down to approximately 2cm. The absence of physical wires implies a new level of robustness and flexibility, permitting regular deep aeration and turf repair without jeopardizing the function of the robot installation. image

Husqvarna EPOS® wire-free Technology

Virtual, wire-free operation through satellite based RTK-GNSS technology, enables an accuracy down to approximately 2cm. The absence of physical wires implies a new level of robustness and flexibility, permitting regular deep aeration and turf repair without jeopardizing the function of the robot installation.

The AI-assisted vision technology enables the robotic lawnmower to detect, classify, and avoid obstacles on the turf. The system operates in both daylight and night-time conditions using infrared illumination. Object classification, including animals, balls, clothing, and standing water, supports effective obstacle avoidance while maintaining mowing efficiency.
Assembly of the accessory is to be performed by an authorised Husqvarna dealer. image

Ready for AI-assisted vision technology accessory

The AI-assisted vision technology enables the robotic lawnmower to detect, classify, and avoid obstacles on the turf. The system operates in both daylight and night-time conditions using infrared illumination. Object classification, including animals, balls, clothing, and standing water, supports effective obstacle avoidance while maintaining mowing efficiency. Assembly of the accessory is to be performed by an authorised Husqvarna dealer.

Improve the visual impression of the turf by changing the mowing pattern. With EPOS® technology, the mower can run in parallel lines and create a variety of patterns, such as diamonds, triangles and checkerboard. image

Selectable mowing pattern

Improve the visual impression of the turf by changing the mowing pattern. With EPOS® technology, the mower can run in parallel lines and create a variety of patterns, such as diamonds, triangles and checkerboard.

Warning lights with pulsating or solid light to create awareness during operation at night. Reduces the risk of accidents in public work environments. image

Warning lights

Warning lights with pulsating or solid light to create awareness during operation at night. Reduces the risk of accidents in public work environments.

Husqvarna Fleet Services™ gives you full control of the mower with the possibility to monitor, control and analyze your entire fleet of products from your smartphone, tablet or laptop. You can overview the status and exact location, command them to start/stop or group-command them to park at storm warnings or in case of thunder. Settings and cutting heights are adjusted easily. Receive alarms and track the mower’s position in case of theft – from everywhere.

Support required from Automower Connect during installation and when editing of EPOS boundary wire free installations. image

Husqvarna Fleet Services™

Husqvarna Fleet Services™ gives you full control of the mower with the possibility to monitor, control and analyze your entire fleet of products from your smartphone, tablet or laptop. You can overview the status and exact location, command them to start/stop or group-command them to park at storm warnings or in case of thunder. Settings and cutting heights are adjusted easily. Receive alarms and track the mower’s position in case of theft – from everywhere. Support required from Automower Connect during installation and when editing of EPOS boundary wire free installations.

Ensures constant wheel contact with the ground, for improved traction on uneven and hilly surfaces. image

Pivoting front-wheel axle

Ensures constant wheel contact with the ground, for improved traction on uneven and hilly surfaces.

Quick-release cutting disc with 1-bolt attachment for fast, easy replacement. Using an extra cutting disc, you can prepare blade changes in advance to minimise maintenance and down time. image

Quick release cutting disc

Quick-release cutting disc with 1-bolt attachment for fast, easy replacement. Using an extra cutting disc, you can prepare blade changes in advance to minimise maintenance and down time.

Spring-loaded cutting system that flexibly adapts to the contour and unevenness of the ground surface, ensuring optimal cutting results. Typical of Husqvarna, the robust cutting disc system is equipped with sharp, razor-like blades made of strong carbon steel, providing an exceptional cutting performance and extremely low energy consumption. image

Floating cutting system

Spring-loaded cutting system that flexibly adapts to the contour and unevenness of the ground surface, ensuring optimal cutting results. Typical of Husqvarna, the robust cutting disc system is equipped with sharp, razor-like blades made of strong carbon steel, providing an exceptional cutting performance and extremely low energy consumption.

Built-in sensors using radar technology assists the mower to detect objects, lowers the speed and avoid hard collisions. image

Object detection by radar

Built-in sensors using radar technology assists the mower to detect objects, lowers the speed and avoid hard collisions.

The product is waterproof (IPX5), which facilitates quick and easy cleaning of the outside and underside with a water hose. The removable top cover provides easy access to simplify regular maintenance. image

IPX5 protected – hose washable

The product is waterproof (IPX5), which facilitates quick and easy cleaning of the outside and underside with a water hose. The removable top cover provides easy access to simplify regular maintenance.

The body's rubber support provides a stable upside-down position for non-slip transport and storage. The position also enables easier maintenance on hard surfaces without causing scratches and damage to the body. image

180° Service Position

The body's rubber support provides a stable upside-down position for non-slip transport and storage. The position also enables easier maintenance on hard surfaces without causing scratches and damage to the body.

Remotely restart a stopped robotic mower via the mobile app, saving time and effort. This feature is handy in case of unplanned stops caused by unauthorised interference, allowing you to quickly resume mowing without physically visiting the mower. image

Enhanced remote start options

Remotely restart a stopped robotic mower via the mobile app, saving time and effort. This feature is handy in case of unplanned stops caused by unauthorised interference, allowing you to quickly resume mowing without physically visiting the mower.

Allows installation of the charging station in areas with no satellite coverage, using a local wire corridor. Gives full flexibility to hide away or protect the charging station under a roof or in a garage. image

Dock by wire

Allows installation of the charging station in areas with no satellite coverage, using a local wire corridor. Gives full flexibility to hide away or protect the charging station under a roof or in a garage.

The fully connected product provides an opportunity to individually customize each work area with a unique time schedule, cutting height and cutting pattern. Provides tailored care for a site with multiple scattered areas. image

Customized work areas

The fully connected product provides an opportunity to individually customize each work area with a unique time schedule, cutting height and cutting pattern. Provides tailored care for a site with multiple scattered areas.

Automatically calculates the most efficient route to and from the charging station’s docking point. It will vary its route on the lawn to avoid unpleasant tracks. image

EPOS® guidance

Automatically calculates the most efficient route to and from the charging station’s docking point. It will vary its route on the lawn to avoid unpleasant tracks.

Seize the opportunity to operate the product using a remote control via the appDrive feature on your smartphone. The handling is easy and user-friendly, sparing you from strenuous, unnecessary lifting when the product needs to be moved between workspaces, to the service facility, or during installation. image

appDrive - operate by remote

Seize the opportunity to operate the product using a remote control via the appDrive feature on your smartphone. The handling is easy and user-friendly, sparing you from strenuous, unnecessary lifting when the product needs to be moved between workspaces, to the service facility, or during installation.

Interface adapted for professional handling, meaning more important settings and controls managed remotely through Husqvarna Fleet Services smartphone app or via PC/tablet. Simplifies use for inexperienced users and minimizes serious impact on the product in case of vandalism. image

Pro user interface

Interface adapted for professional handling, meaning more important settings and controls managed remotely through Husqvarna Fleet Services smartphone app or via PC/tablet. Simplifies use for inexperienced users and minimizes serious impact on the product in case of vandalism.

Electric cutting height adjustment makes it convenient to set the desired height via the Husqvarna Automower® Connect app. The setting is also accessible from the mower’s main menu. image

Electric height adjustment - PATENTED

Electric cutting height adjustment makes it convenient to set the desired height via the Husqvarna Automower® Connect app. The setting is also accessible from the mower’s main menu.

Specifications

Art No: 970730307
Product size length78 cm
Product size width59 cm
Product size height31 cm
Cutting width (metric)26 cm
Weight (complete product w/o side packed articles)16.7 kg
Battery capacity4 Ah
Charging current4 A
Cutting height min20 mm
Cutting height max60 mm
Extra blades0 pcs
Area capacity8000 m²